Service Hotline 029-81320570
Home > News > Industry news

The 84 compressors of the west east gas pipeline run 220 thousand hours a year

The 84 compressors of the west east gas pipeline run 220 thousand hours a year.

Source: China air compressor network


Core Tip: Recently, we learned from the West-East Gas Pipeline Company that the total number of compressor units in the company reached 84, running more than 220,000 hours this year, the cumulative running time over the years exceeded 1.9 million hours, the completion rate of regular maintenance was 100%, availability was more than 97.8%, and the general failure timely removal rate was 100%, which did not affect gas transmission production. Failure. The west east gas pipeline has continuously strengthened its technical support and support capability and improved the reliability of compressor units. The company organizes the maintenance and repair of compressor units in combination with the actual organization, timely discovery and treatment of faults and hidden dangers, to ensure the safe and stable operation of the units and continue to do a good job in new unit commissioning technical support. This year

Recently, we learned from the West-East Gas Pipeline Company that the total number of compressor units reached 84, running more than 220,000 hours this year, the cumulative running time over 1.9 million hours over the years, the completion rate of periodic maintenance is 100%, availability is more than 97.8%, and the general failure timely removal rate is 100%. There are no problems affecting gas transmission production.

The west east gas pipeline has continuously strengthened its technical support and support capability and improved the reliability of compressor units. The company organizes the maintenance and repair of compressor units in combination with the actual organization, timely discovery and treatment of faults and hidden dangers, to ensure the safe and stable operation of the units and continue to do a good job in new unit commissioning technical support.

Since the beginning of this year, the west-to-east gas pipeline has strengthened the operation, maintenance and management of compressor units, done a good job in organizing important maintenance operations, to a greater extent, shaken off the technical dependence on foreign manufacturers; carried out professional maintenance and inspection of equipment, and compiled operation instructions in order to guide the follow-up independent operation.

The compressor management office is actively developing tapping potential and increasing efficiency activities, for YanChi Railway Station No. 1 and No. 3.

The group implemented energy saving transformation. After the renovation, each unit of Yanchi Station can meet the requirements of gas flow and pressure in the West Line and the Zhongjing Line; carry out the upgrading and renovation of the frequency converter of the domestic unit, greatly improve the power factor of the electric drive compressor station during the equipment shutdown period, the renovation is simple and convenient, with less investment and practicality; actively promote the promotion of domestic lubricants; and Domestic lubricating oil manufacturers cooperate to carry out the mixing test of imported lubricating oil and domestic lubricating oil for the imported compressor unit of Nanchang Station to realize the replacement of domestic Kunlun lubricating oil. The next step is to gradually select the machine to promote in other stations.